In virtually all configurations, the C300 controller and Series C I/O provides useful, maintainable process equipment connections in a smaller footprint than existing competitors and Honeywell equivalent products. Installing Series C I/O modules contributes to overall total installed cost savings.
Brand:HONEYWELL Model number:51303940-250
Colour:new Warranty: 12 months
Lead Time:3-day working day Country of origin: USA
Price: Please contact us Product weight:0.22kg
hipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Servce: Professional Sales provides 24 hours /7 days online service
51303940-250 Honeywell Power module Brand new
Determining Series C I/O block redundancy
The IOM blocks represent instances of the I/O Module hardware that reside on the I/O Link
network. There is a specific IOM block for each I/O Module type supported in Experion.
The IOM block is used to:
l configure the network address (the IOMNUM) of the IOM device.
o If the IOM is configured to be redundant, you enter only one IOMNUM. In either case,
only one block is created which handles communication to and from both physical
IOMs.
o The hardware design uses a set of push-in IOMNUM identifiers to reduce the chance
of duplicate IOMNUMs on the same link.
o Each IOM block generates system events and alarms for soft failures, IOM
synchronization, and IOM switchover.
Figure 9.1 Defining redundancy from the Main tab
9.2 Switchover and Secondary readiness
A switchover describes the process where a Secondary Series C module assumes the Primary
state, and the Primary Series C module assumes the appropriate Secondary state of readiness,
depending upon what triggered the switchover. A switchover can be triggered immediately upon
the detection of a fault in the Primary or upon the receipt of an operator command.
The ability of a Secondary Series C module to take over the assigned control functions of the
Primary depends upon which one of the following readiness states reflects its current state.
If Secondary
redundancy
state is
Then, the Secondary module
NotSynced
Not
synchronized
Cannot assume the Primary state. This is a state of non-readiness. Switchover has
not occurred. Ensure redundancy has been selected on the IOMs Main tab.
FoInProg
SwapInProg
Cannot assume the Primary State. In this state, the Secondary module is copying
database information from the Primary
.
.
We have the same series of models in stock. If you don't find the model you need, please contact us and we will provide you with an official quotation!
HONEYWELL 30750338-005
HONEYWELL 51403393-100
HONEYWELL 30751044-4
HONEYWELL 30751044-009
HONEYWELL 30751044-7
HONEYWELL 51403393-200
HONEYWELL 4DP7APXIO211
HONEYWELL 30750318-2
HONEYWELL 30750318-3
HONEYWELL 51196882-100
HONEYWELL 51304095-100
HONEYWELL 51400997-200
HONEYWELL 51401088-100
HONEYWELL 51400926-100
HONEYWELL 51304537-100
HONEYWELL 51401583-200
HONEYWELL 51401583-100
HONEYWELL 51401996-100
HONEYWELL 51304421-100
HONEYWELL 51304441-175
HONEYWELL 51107137-117
HONEYWELL 51196654-100
HONEYWELL 51196653-100
HONEYWELL 51400712-100
HONEYWELL 51204166-175
HONEYWELL 51401201-100
HONEYWELL 51401577
You are welcome to make an inquiry
E-mail:
free@fenoux.com
Tel.:
+86 133 7698 4225
Skype:
+86 133 7698 4225
WhatsApp:
+86 133 7698 4225